Sobyanin announced new roads in the areas of Maryina Roshcha and Butyrsky
To the north-east of the Garden Ring, about three kilometers of new roads will be built, and part of the existing ones will be reconstructed.

To the north-east of the Garden Ring, about three kilometers of new roads will be built, and part of the existing ones will be reconstructed. This was announced by the mayor of Moscow Sergey Sobyanin in his Telegram channel.
“Now we are starting the construction and reconstruction of roads on the border of Butyrsky and Maryina Roshcha districts,” the mayor wrote. So, the passage length of about a kilometer will connect the streets of Dobrolyubov and Vetkin with the Garden Passage. From it down to folding street will be laid another single-lane section of passage.
Another road along the tracks of the IDC-2 will connect two existing passages - there will be organized circular traffic. The turning ring will also appear near the Savelovskaya platform - it will have access to Dvintsev Street. In the future, it will connect with Novodmitrovskaya Street, which will facilitate the movement of passengers between the metro and the IDC. Construction is scheduled to be completed in 2027.
In recent years, several important transport projects have been implemented in the northeast of Moscow. In 2024, a tunnel was opened under the MCD-4 tracks, which greatly simplified the exit from Stacking Street to Dvintsev Street and then to the Third Transport Ring. In 2026, there was a link road under the tracks of the MCD-2 between Dobrolyubov and Stacking streets. This made it possible to connect the development on Stacking Street with the metro stations and the MDC of Maryina Roshcha and Timiryazevskaya, neighboring areas and social facilities with a convenient bus route 512, Sobyanin recalled.



