In Minsk, work continues on the section of the broken pipeline near the street. zhukovsky
A powerful breakthrough of heating networks occurred in Minsk on the street. Zhukovsky on September 27. The stage of pumping water from the heat ...

A powerful breakthrough of heating networks occurred in Minsk on the street. Zhukovsky on September 27. The stage of pumping water from the heat chamber has already been completed, specialists continue work on this site, the correspondent of the Minsk-Novosti agency reports.
https://minsknews.by/wp-content/uploads/2026/09/0927-4.mp4
Power engineers of the Minsk Heat Networks branch of the Minskenergo enterprise perform earthworks. Specialists are excavating the site to accurately determine the site of damage to the pipeline.
This situation remains under special control of Minskenergo.
Minskenergo video



