Moscow-Petersburg HSR enters full-scale construction phase
The construction of a high-speed highway between Moscow and St. Petersburg has entered the phase of full-scale construction, Deputy Prime Minister Andrei Nikitin announced.
The construction of a high-speed highway between Moscow and St. Petersburg has entered the phase of full-scale construction, Deputy Prime Minister Andrei Nikitin announced.
“At the HSR Moscow — St. Petersburg moved to full-scale construction,” he said (quoted by “Interfax”), speaking at the plenary discussion “Transport of Russia: points of growth of the country.”.
According to Nikitin, it is planned to create 679 km of new infrastructure with the help of more than 32 thousand specialists and 11,000 units of equipment.
150 enterprises are involved in the HSR construction project. The first three speed trains are already in the assembly process. “We are creating not one railway, but a real domestic technological platform: train, track, contact network, communication, management and security,” he said.
The first tests of trains with a maximum speed of up to 400 km / h are planned for 2027.
The Moscow-Petersburg HSR project is one of the largest transport projects in modern Russia. The length of the highway will be 679 km, and commissioning is scheduled for 2028.
The project provides for the laying of highways in the Moscow, Tver, Novgorod and Leningrad regions and the construction of stations, including the HSR station in Veliky Novgorod. HSR will allow you to get from Moscow to St. Petersburg in 2 hours and 15 minutes, to Tver in 39 minutes, to Zelenograd in 14 minutes.
On November 7, Russian Railways announced the completion of the first stage of tests of the upper structure of the track for the Moscow-St. Petersburg Highway. Testing took place at the Sablino-Tosno test site in the Leningrad region, where experts assessed the operation of the elements in conditions close to operational.



