Alesya and Maria are building tunnels. Find out at what stage the construction of new metro stations in Minsk
In Minsk, the construction of the station complexes "Komarovskaya" and "Perespa" are planned to begin in 2027. This was announced on November 27 during the meeting.

In Minsk, the construction of the station complexes "Komarovskaya" and "Perespa" are planned to begin in 2027. This became known on November 27 during a meeting led by the Chairman of the Minsk City Executive Committee Vladimir Kukharev, reports “Minsk-Novosti”.

In the capital continue to extend the Zelenoluzhskaya metro line. The tunnels, which will connect three new stations (Komarovskaya, Perespa, Peoples’ Friendship Park), lay two mechanized complexes at once - Alesya and Maria. In a month they are able to overcome 250 meters each. By the way, "Maria" took up business only in May 2026, and by the end of July passed the first 277 meters.
- Now "Alesya" is located in the area of the hotel "Belarus". “Maria” has already gone beyond the borders of “Komarovskaya”, which will be located under the crossroads of M. Bogdanovich and V. Khoruzhey street, and moves towards “Perespa”, – said the Directorate for the construction of the Minsk metro Ivan Mikulsky. – By the way, the development of pits continues at “Komarovskaya” and “Perespe”. The construction of the station complexes themselves is scheduled to begin in 2027.
In parallel, specialists conduct monolithic work at the Peoples’ Friendship Park station. The completion of this stage is planned in January. Due attention is paid to the reverse dead ends, where the trains will turn. The reverse filling of the soil is planned to be performed in early 2027.
The task is complicated by difficult weather conditions and watered soils. To cope with this kind of load, water reduction systems operate on construction sites around the clock, Ivan Mikulsky added.
In addition, the necessary equipment for future stations has already been purchased.
We did not ignore the fourth (ring) line of the metro. Design decisions for the preparatory period of its construction are now at the final stage - the documentation is being examined.
- As soon as we get a positive conclusion, we will start choosing contractors and concluding contracts, said Ivan Mikulsky. The first section of three stations will connect the Peoples’ Friendship Park and Vesnyanka residential area. Its length will be slightly more than four kilometers. In the future, the line will go towards Pushkinskaya.
Summing up the meeting, the Chairman of the Minsk City Executive Committee stressed: the metro is one of the most popular types of public transport in the capital.
- It is not necessary to delay with the deadlines for the work, since new stations are important for unloading city highways and ensuring comfortable communication between the districts of the city, Vladimir Kukharev summed up.



