Until November 25, the section of Bolshaya Radishchevskaya in Penza is closed
On the street Big Radishchevskaya changed the scheme of movement

On the street Big Radishchevskaya changed the scheme of movement. The driveway is closed in the area of the house No. 10 on Pushkin Street.
The restriction was introduced due to emergency recovery work on the section of the heat main, which is carried out by the Penza branch of PJSC T Plus.
It is expected that the road will be opened for transport at the end of the work, November 25.
Motorists are advised to consider these changes when planning their route.



