The movement of buses on the bridge over Svisloch near Minsk will resume from November 9
In the Minsk region from November 9, the movement of shuttle buses across the bridge over the Svisloch River closed earlier for repair in the area of the agro-town will be restored.

In the Minsk region from November 9, the movement of shuttle buses across the bridge over the Svisloch River closed earlier for repair in the area of the agro-town Novy Dvor will be restored. This was reported by sb.by in the press service of SE “Minsktrans”.

The company was informed:
- In connection with the completion of construction work from November 9, the movement of the bus route No. 176E "DS "Serova" - "DS "Shabany" is restored on a permanent route (through the agro-town Novy Dvor) and the previously operating timetable.
Earlier it was reported that in connection with the repair of the bridge (5,930 km of the H-9050 highway Yelnitsa – Korolishchevichi – New Dvor) changes were made to the route of suburban routes No. 312a “Minsk – Matsevichi through Gatovo, Korolishchevichi” and No. 316 “Minsk – Matsevichi through Korolishchevichi”. Minoblavtotrans has not yet reported the resumption of traffic on the previous highway.
As sb.by wrote, before the start of repair work on the bridge in the agro-town of Novy Dvor, it was assumed that the work would take place in two stages with the alternate closure of the right and left sides of the structure. However, later experts came to the conclusion that for maximum acceleration it is necessary to block all movement. As a result, it was decided that the bridge will be closed to motorists from October 1 and approximately until December 31. Ministry of Transport: all transport and road services are prepared for work in winter



