Traffic over the bridge in the village of Lukino near Serpukhov opened after overhaul
In the village of Lukino, part of the urban district of Serpukhov, opened traffic on the overpass

The overpass is important for residents and traffic, its capacity exceeds 2,000 cars per hour. The construction of 1965 has long required serious repairs. After the work, the facility is designed for 60-80 years of operation. The warranty for the construction is up to 8 years, the upper coating will be inspected annually.
The work was carried out ahead of schedule: in less than a year, a full cycle of capital repairs was made - the span structures, beams, supports and approach paths were replaced. There was protection over the tracks of composite materials, LED lighting, barrier fence, rain sewerage and equipped descents from the curb.
Temporary markings have been made so that the new asphalt can be established. As soon as the coating gains strength, apply a permanent thermoplastic marking.



