Efimov: the architectural solution of “Olympic” will unite several buildings
The multifunctional complex “Olympic”, which is being built next to the future metro station “Dostoevskaya”, is almost 80% ready

The multifunctional complex “Olympic”, which is being built next to the future metro station “Dostoevskaya”, is almost 80% ready. The unique architecture will connect the buildings into a single volume.
Multifunctional complex "Olympic" in the area Meshchansky built almost 80%. Inside the sports facility, visitors will find an infrastructure unparalleled in the world: it will be possible to engage in more than 40 sports, including football, volleyball and tennis, said Vladimir Efimov, head of the Moscow Complex of Urban Planning Policy and Construction.
The world’s largest indoor water complex with 15 swimming pools, Russia’s largest water park, FOK, a cinema cluster, two concert complexes, a panoramic revolving restaurant and a shopping gallery will soon open.
Upon completion in 2027, the complex is expected to become the main event venue in Russia and will accommodate up to 62 million people a year, and more than 8 thousand jobs will appear.
The main building with a concert hall is almost 80% ready, the water complex - 60%, FOC - 99%.
Vladimir Efimov added that the designers united the main building and the water complex with a kilometer panoramic treadmill at an altitude of 41 m and a bridge with a media roof - together they form a form of infinity, symbolizing the movement and unity of culture and sport.
Earlier, Moscow Mayor Sergei Sobyanin said that the Olympic will be a unique world-class project.



