Getting ready for spring from autumn
A meeting was held on the readiness of the regions for the winter period 2026-2027 and the preparations for the spring flood season

This winter is expected to be warmer than the previous one. In the western, northern and eastern regions, increased precipitation is predicted, which carries the risks of snow drifts and ice.
Today, more than 40,000 people and 15,000 units of equipment have been trained to respond to emergency situations, and 1,729 heating points with a total capacity of over 144,000 people in the regions. To work on the roads prepared 1987 units of snow removal equipment, formed stocks of 409,000 m3 of deicing materials.
Deputy Prime Minister of Kazakhstan Kanat Bozumbayev instructed the Ministry of Transport, together with akimats, to ensure timely cleaning of roads, installation of snow shields and redeployment of equipment to difficult areas, and the Ministry of Emergency Situations to ensure the readiness of rescue units and strengthen prevention.
Preparations for the flood period of 2027 are considered. It was instructed to strengthen control over the state of reservoirs, prepare a hydrological forecast for the regions and complete the modernization of the Taskyn system to improve the accuracy of flood forecasting.



