GZHI reminded Kirov on the consequences of the failure of the timing of capital repair
The Ministry emphasizes that all planned restoration work in apartment buildings should be carried out strictly within the terms approved by the regional program

Violation of the established rules threatens serious consequences for owners.
According to part 7 of Article 189 of the LCD, if the overhaul is not performed on time, the local government body has the right to make a decision on the forced transfer of the fund to the regoperator.
In such a situation, the residents of the house lose the ability to independently accumulate and distribute funds on a special account.
In addition, the inspection draws attention to the procedure for providing mandatory reporting after all procedures have been completed.
Owners of special accounts are obliged to transfer documents confirming the repair to the NGO “Capital Repair Fund of Common Property of Apartment Buildings in the Kirov Region”.
This must be done within 1 month from the date of signing the act of acceptance of the work performed.
Timely implementation of capital repair plans directly affects the safety and comfort of living in apartment buildings, so residents of the region and management organizations are recommended to organize and coordinate the entire process in advance.



