Kirillovskoe highway in Cherepovets put into operation after repair
The head of Cherepovets Andrey Nakroshaev conducts an inspection of objects that were handed over after repair

The head of Cherepovets Andrey Nakroshaev conducts an inspection of objects that were handed over after repair. Capremont Kirillovskoye highway was held in the framework of the national project “Infrastructure for life”. In the regulatory state brought a section of 1.2 km from the street School to Zarechna
Here the roadway was updated, sidewalks were organized, entrances to stops were made, stops were paved.
The contractor worked out a number of comments on pedestrian routes: understatements were made, convenient approaches to sidewalks and pedestrian crossings were made. The sidewalks were rounded, removing right angles. This will increase safety and prevent lawns from trampling. Territories are landscaped - curbs are put up, lawn is sown.



