Ministry of Energy: Belarus has completed the preparation of heat supply systems for operation in the autumn-winter period
Preparation of heat supply systems for operation in the autumn-winter period is completed. This was reported in the press service of the Ministry of Energy, writes sb.by. Illustrative ...

Preparation of heat supply systems for operation in the autumn-winter period is completed. This was reported in the press service of the Ministry of Energy, writes sb.by.

As noted in the report, the schedules are completed in full. Specialists of the State Energogaznadzor conducted more than 38 thousand surveys of electric and heat installations, checked more than 43 thousand gasified apartment buildings.
100% of readiness passports are registered: more than 27.7 thousand – from heat energy consumers, more than 10.3 thousand – from heat sources. More than half of the documents are issued in digital format through the portal “E-Pasluga”.
- Decisions on the inclusion of heating are taken by regional, district and city executive committees taking into account the average daily air temperature and forecasts of Belhydromet. The heat supply is carried out in stages: social facilities are first connected, then the housing stock, after administrative buildings, industrial and other organizations, the Ministry of Energy reminded.
In the housing Fund of Minsk began heating



