At Naryan-Mar power plant replaced the gas turbine engine
Reliable power supply in the Far North requires constant attention to the condition of the equipment and timely repair work

Reliable power supply in the Far North requires constant attention to the condition of the equipment and timely repair work. At the Naryan-Mar power plant, specialists of the gas turbine and electric workshops performed a planned replacement of the gas turbine engine GTD-6RM.
As part of the engine rotation, a B6-47 was delivered to the station, which underwent major repairs. In turn, the engine B6-45, which has developed a service life, was sent to the manufacturer for restoration.
Such work organization allows timely maintenance and overhaul of equipment, maintain generating capacities in good condition and ensure reliable operation of the power plant.
The professionalism of specialists and the availability of a revolving fund of engines help the State Unitary Enterprise of Naryan-Mar Power Plant to maintain the stable operation of equipment and ensure uninterrupted power supply to consumers of the Nenets Autonomous Okrug.



