On the streets of Kostroma before the cold restore the road surface
In Kostroma intensified work to restore the road surface before the onset of cold weather

In Kostroma, work has been intensified to restore the road surface before the onset of cold weather. Particular attention is paid to streets with heavy traffic, public transport routes and areas near socially significant objects. The task is to eliminate the existing damage to the asphalt and complete part of the work before the deterioration of weather conditions.
On the eve of the road workers were engaged in pouring seams and cracks on the streets of Titov and Northern Pravda, eliminated defects on Radiozavodskaya, prepared the grounds for pylons on Lenin and performed work near the stops on Solonikovskaya. On Zaitsev and Sitsev passage, sand and gravel bases were arranged, and on the lace passage a road base was formed. Grading with rubble was carried out on Green and Communal.
On September 23, it is planned to repair the cast asphalt mixture and prepare the grounds for a stop at Solonikovskaya. On the Northern truth continues sealing seams and cracks. Near kindergarten No. 51 in the Yubileiny district, sidewalks are being repaired, and the grounds for pylons are being prepared for Lenin and Soviet. Work also continues on the Sitz passage, Zaitsev, Azure and Sail.



