Objects of the Caspian Flotilla are fully ready for the heating season
Boiler houses, residential buildings, medical and preschool institutions of the Caspian Flotilla are fully ready for the heating season of 2026-2027

Boiler houses, residential buildings, medical and preschool institutions of the Caspian Flotilla are fully ready for the heating season of 2026-2027.
To reduce the risks of failures in the heating period of 2026-2027, LCS No. 4 in Kaspiysk conducts weekly emergency training with simulation of situations to eliminate technological violations. Special attention is paid to emergency reserves of forces and means. In all operated towns there are emergency repair teams staffed by 100%.
All 100% of the housing stock passed hydraulic tests - washing and pressing, certificates of readiness of general house heating systems were received. Preparation for the heating season takes place in normal mode, without technological violations, the press service of the flotilla reported.



