Thursday, November 12, 2026Moscow
Society

Heat will not come immediately: named stages of heating in residential buildings of Novosibirsk by dates

From September 28 in Novosibirsk will start a phased connection of heating in residential buildings

Published
Heat will not come immediately: named stages of heating in residential buildings of Novosibirsk by dates

The connection is divided into four stages. After starting the heat, specialists will need time to check the system and adjust its parameters, so heating will not appear in different houses at the same time.

The first stage: September 28 - October 1. These days, heat will be supplied to homes connected to CHP-2, CHP-3, CHP-4 and CHP-5. The schedule included separate sections of streets Kotovsky, Vatutin, Permitina, Planirova, Puteva, Inskaya and Serebrennikovskaya. Connection will also begin in Zaton, Trollein and Zatulinsky residential areas. During the same period, work will take place in houses from a number of local boiler houses.

The second stage: 2-5 October. Connection will continue on the streets of Blyukher, Exhibition, Geodetic, Kolyvan, Kainskaya, Sibrevkom, Chaplygin, October, Maxim Gorky, Shchetinkin, Deputy, Factory, Kubanovskaya and Vladimirovskaya. The works also involve Trolley, Zatulinsky and Akatuysky residential areas, separate streets of the Kirov district and the territory of heat supply to CHPP-4.

Phase three: October 6-9. Heat will be served in the Gorsky district, on the streets of Sports, New Year, Vertkovskaya and Nemirovich-Danchenko. The list also includes territories near the regional hospital and the Panorama residential complex. In the central part of the city, the connection will affect the streets of Boris Bogatkov, Voskhod, Guryevskaya, Zyryanovskaya, Dobrolyubov, Nikitin, Kirov, Decembrists, Garden, Bolshevik and Ob. Work will continue in the Western, Stanislav and Bugrin residential areas.

Phase four: October 10-16. At the final stage, heating will begin to be served in the area of Karl Marx Square and Telecenter, as well as on Vatutin, Communist, Soviet, Sverdlov, Uritsky, Revolution, Lenin, Dimitrov Avenue, Komsomolsky Prospect and Railway Station. On the left bank, the schedule included the South-West residential and Clean Sloboda, as well as part of the streets of the Kirov district. From CHPP-5, the connection will affect, in particular, the housing of Chelyuskintsev and Shevchenkovsky.

Earlier, "MK in Novosibirsk" reported a significant increase in utility tariffs from October 1.

Source: Московский комсомолец ↗

Share

More on This Story

The son of Dmitry Gudkov committed suicide
SocietyThe son of Dmitry Gudkov committed suicide

Ivan Gudkov, the son of oppositionist Dmitry Gudkov and his first wife, Sophia Kapkova, committed suicide. Ksenia Sobchak said that he reported on the difficulties of emigration

Яна Соловьева
PCT reported 23 complaints of sick tourists from a hotel in Turkey
SocietyPCT reported 23 complaints of sick tourists from a hotel in Turkey

Since August, insurance companies have recorded 23 appeals from tourists vacationing in the Turkish hotel Bosphorus Sorgun, with similar complaints of poor health, told RBC in the press service of the Russian Union of Travel Industry (PCT).

Евгения Сорокина, Виктория Хабарова
In the fighter MMA “Nikarho” shot from the trauma in the center of Vladikavkaz
SocietyIn the fighter MMA “Nikarho” shot from the trauma in the center of Vladikavkaz

In the center of Vladikavkaz, a man was injured as a result of shooting from a traumatic pistol, the Ministry of Internal Affairs for North Ossetia reports.

Виктория Хабарова, Александра Озерова
The EIA Briefing

Keep reading, every morning.

The stories that matter, chosen by our editors and in your inbox before 7 a.m. — every weekday.

No spam. Unsubscribe anytime.