Tver specialists helped to repair the substation in Berdyansk
Workers stretch 180 meters of power cable

An emergency brigade from the Tver region helped restore the work of the transformer substation in Berdyansk. This was reported in the “Diary of Chief Aid”.
The specialists worked together with the local network service. They made urgent repairs to the equipment.
The workers stretched 180 meters of power cable. They also replaced the circuit breakers with 40 amps.
In addition, the power engineers performed the compression of the plumes and tightened the bolt connections.



