In the Akushinsky district replaced the poles of the power line on the feeder “Natsy”
Specialists of the Levashinsky district electric networks replaced the supports on the power line with a voltage of 10 kV from the Natsy substation in the Akushinsky district, Dagenergo reports

Specialists of the Levashinsky district electric networks replaced the supports on the power line with a voltage of 10 kV from the Natsy substation in the Akushinsky district, Dagenergo reports.
The work was carried out by the brigade of the Akushinsky branch of the Levashinsky RES on feeder No. 3.



