In Belgorod on a number of streets road repair is nearing completion
Road repairs continue in Belgorod, Mayor Valentin Demidov said

Road repair continues in Belgorod, Mayor Valentin Demidov said. Work is underway on the main highways, the repair of which began earlier, and on additional sections, which were included in the plan in October.
On Vatutin Avenue (from August 5 to the overpass) the stabilization and preparation of the base were completed. Now experts form the lower layer of asphalt concrete coating.
On the street Vokzalnoy performed the bulk of the work, laid the finishing layer of asphalt. Only road markings should be applied. Ready, 95%.
On Kalinin Street (from Belgorod Prospekt to Industrial Street), the work is entering the final stage. The markings are already 95 percent.
On the street of Nikolai Chumichova (from Belgorod Prospect to Oktyabrskaya Street) laid asphalt concrete covering. Ahead is the application of road markings.
On Budyonny Street (from Konev Street to Gubkin Street), road work has come to an end, there are markings. It remains to install new road signs.
On Preobrazhenskaya Street (the second stage, from Vozzalnaya Street to N. Chumichov Street), asphalting was performed by 95%, paving slabs and black earth layout by 60%. The total readiness of the object is 80%. Experts have already begun to asphalt the races.
On the overpass on the Mikhailovsky highway, work on the first side was done by 75%. Now the road workers have begun to install asphalt concrete coating on the approaches.
Repairs are continuing at additional sites. On Civic Avenue (from Vozzalnaya Street to Popov Street), the replacement of the side stone and the arrangement of the side tray began. And on Preobrazhenskaya Street (from B. Khmelnitsky Avenue to Sumy Street) the side stone is partially changed and paving slabs are restored.
Recall that in the Novooskol district repaired the road on the national project.