In Horlivka in September eliminated 790 accidents on water supply networks
Utilities washed almost two kilometers of sewer networks and replaced more than 415 meters of emergency pipes

In Horlivka, utilities continue the round-the-clock struggle for the stability of water supply in a difficult operational environment. The joint efforts of specialists of the State Unitary Enterprise DPR “Water of Donbass” and emergency recovery teams from the Russian region-chief of Kuzbass from September 1 to 30 eliminated 790 accidents on water and sewerage networks.
During this period, more than 415 meters of emergency pipe sections were replaced, of which almost 100 meters were laid together with Kuzbass specialists. Only on sewer networks removed 440 blockages and washed almost two kilometers of networks.
This systematic work, carried out within the framework of the project “Reviving Donbass together!”, allows to maintain the functioning of the critical infrastructure of the city, despite external threats and risks.



