The city administration announced the opening date of the Great Soviet
The head of Smolensk Alexander Novikov held a traditional city-wide meeting dedicated to issues of urban economy, street maintenance and topical topics of concern to residents

The head of Smolensk, Alexander Novikov, held a traditional city-wide meeting dedicated to issues of urban economy, street maintenance and topical topics of concern to residents.
As part of the activities of Smolenskavtodor, repair work has already been completed at all current facilities. Currently, experts are engaged in the application of road markings and the installation of road signs. At the same time, plans for 2027 are being formed, during which the scope of work and priority areas are determined.
All cleaning equipment was fully prepared for the winter season. Until the onset of sustainable snow cover, the streets are cleaned of foliage, sand and dirt according to the daily schedule. Alexander Novikov noted that in the future the schedule will be adjusted depending on weather conditions: if the situation changes, the authorities will promptly make changes and strengthen the outputs of equipment on the line.
Also during the meeting, the topic of repairing the heating network on the Big Soviet Street was touched upon. The branch of RIR Energy – Smolensk Generation has already completed restoration work and soil compaction. Today, the contractor plans to install the side stone and lay the bottom layer of asphalt, and the completion of the upper layer is scheduled for November 10. It is expected that the street will be fully open to traffic in normal mode on Wednesday, November 11.



