In Kostroma and Vokhma completed three more works on the appeals of residents to the governor
In the Kostroma region continue to carry out the instructions of Sergei Sitnikov, formed on the basis of a direct line with residents

In the Kostroma region continue to carry out the instructions of Sergey Sitnikov, formed on the basis of a direct line with residents. In total, about 1.5 thousand messages were received to address the head of the region. Three more tasks were reported to the governor on October 8.
In the center of Kostroma, a pedestrian staircase connecting Ostrovsky Street with Dairy Mountain was repaired. The old steps were dismantled, a new concrete base was prepared, tiles were laid and parapets were installed. The updated descent has become more convenient and safer for citizens and tourists. In addition, on the site from Kostroma Street to Lenin Street, lighting was equipped. The line runs along the garden associations, the villages of Skorbezhki and Maricino, in total, more than 100 lamps have been installed.
Another order was carried out in the village of Vokhma: at the request of residents of Flower Street, a section of the road was repaired. The work was carried out within the framework of the local initiatives program. On the street they organized drainage, prepared a sand and gravel base and laid gravel covering. Travel should be more comfortable throughout the year.



