In Krasnoluchsk school No. 3 is repairing the assembly hall and food block
The building was damaged during the fire

In Krasnoluchskaya school No. 3, restoration work is underway in the assembly hall and the food unit. Details were found out in the GBU LNR “Luganmedia”.
The building suffered significant damage from a fire in April this year. Thanks to the support of the Ministry of Education and Science of the LPR at the expense of the regional budget, contractors have already dismantled old coatings and performed floor screeding.
According to the head of the district education department Christina Prochukhan, the main communications in the premises have been replaced: electrical wiring and drainage pipes. In the near future, new window blocks will be installed here, the order for which has already been issued.



