In Mariupol complete the renewal of the building of the industrial and technological technical school
In the building with an area of 3.5 thousand squares, facade work is completed

In the Ordzhonikidze district of Mariupol, a large-scale reconstruction of the educational building of the industrial and technological college is being completed. Specialists of the public law company “United Customer in Construction” have reached the final stage of facade work.
According to the company, the building with an area of more than 3.5 thousand square meters has already acquired new roof, windows and reinforced load-bearing structures. Now the interior is actively being decorated, the installation of modern engineering systems, as well as the installation of fire and security alarms. Comprehensive improvement is planned in the adjacent territory.
The history of this educational institution began in 1954, and over the decades it has trained more than 16 thousand masters. After the opening, the updated building will be able to accommodate about 400 students. The completion of the main works is planned before the end of the year as part of the socio-economic development program.



