In Murmansk found a St. Petersburg contractor for the repair of the Central basin
In Murmansk signed a contract for the overhaul of the Central swimming pool

In Murmansk signed a contract for the overhaul of the Central swimming pool. This was announced by the head of the region Andrey Chibis during a direct line.
The building of 1966 will be completely renovated. The work will be performed by the St. Petersburg company RIGIL. The company is already building an indoor pool on Kola Prospekt in Murmansk.
Builders will have to repair the roof and facade, strengthen arched structures, replace stained glass windows and install architectural and artistic illumination. There is also a lot of work inside: sports equipment and engineering networks will be completely updated, a new stainless steel bowl will be put in place. At the same time, the unique size of the pool - 50 by 20.8 meters - will be preserved. For fans, stands for 400 seats will be mounted.
Earlier, “MK in Murmansk” said that the only 50-meter pool of Murmansk was to begin repairing in September.



