In Novosibirsk at the metro station “October” updated turnstiles
In Novosibirsk opened the lobby number 1 metro station “Oktyabrskaya” after the replacement of turnstiles

The lobby was closed for ten days, while specialists dismantled the old equipment and installed new generation turnstiles, the press service of the Novosibirsk metro reported.
Updated turnstiles support payment with transport and bank cards, tokens and biometrics. Thanks to the new design, an additional corridor to the platform was organized in the aisle zone, which increased the throughput of the entrance.
“The work on replacing the old turnstiles on the new generation model was completed ahead of schedule,” the subway said.
"October" became the fourth station of the Novosibirsk metro with updated turnstiles. The modernization of the company is carried out at its own expense. In the future, similar turnstiles are planned to be installed at all stations of the Novosibirsk metro.
Earlier, "MK in Novosibirsk" reported that they propose to build a highway, which can reach Moscow in an hour.



