In Pushchino, utilities eliminate the accident
At 20:30 in Pushchino two apartment buildings remain without hot water supply

Four people and three units of equipment work at the site. A survey of the intra-quarter network showed that a section of the pipeline with a length of more than 80 meters in a single-pipe version requires a complete replacement.
“The necessary materials have been delivered. Tomorrow, the contractor will allocate specialists to help in the installation of pipelines, said the head of the Serpukhov city district Alexei Shimko.
The situation is under the control of the Ministry of Housing and Communal Services of the Moscow Region.
In neighborhood G, house 7, there was an accident. Elimination is carried out by the management company LLC "KS Pushchino". Work is ongoing.



