In the squares of Kryukov, "Mirabel" and Bolshevik prepare the grounds for the tracks
In the city district Serpukhov simultaneously improve three public areas

In the park named after Kryukov completed dismantling - the builders arrange a sand and gravel base of the tracks and develop the soil under the side stone. Employed five workers and two units of equipment. In the park "Mirabel" the front of work is wider: there make road surfaces and foundations for small architectural forms, pull trenches for video surveillance and power supply, put fencing, flower beds and lighting supports. The facility has 12 people and four cars.
In the square of the village of Bolshevik, after dismantling and removing garbage, pedestrian paths are prepared: a sand pillow is poured, a side stone is mounted and gravel is laid. There are six workers with one unit of equipment.



