In Volgograd provided electricity to five high-rise buildings and 370 private houses
Special attention is paid by specialists to large objects.

Volgograd Resource Supply Organization reported on impressive results since the beginning of the year. Five apartment buildings with a total capacity of 1.4 MW are connected to the networks, as well as more than 370 private households.
So, in the Krasnoarmeysky district, the connection of an 18-storey residential complex with a capacity of 435 kW has been completed. The house, built on the picturesque shore of the Volga-Don Shipping Canal, will become not just a place of residence, but also a full-fledged public space - it provides commercial premises for shops and services.
No less significant project was implemented in the Soviet region. Here, power engineers provided electricity to a 21-storey new building with an area of 4.8 thousand square meters. In the house, designed for 95 apartments, the connection capacity exceeded 390 kW. Such a power reserve ensures that future residents will be able to comfortably use all modern electrical appliances without the risk of overload.



