In Volgograd, the installation of the frame of a new school in the Soviet district is completed
Builders have already completed 90% of the work on the construction of reinforced concrete foundation of the future educational institution

According to the administration of Volgograd, at the site in the neighborhood of the Spring Valley, the contractor fully mounted the columns, floors and staircases of all floors of the building. The educational institution, designed for 1,280 students, is being built as part of the national project “Youth and Children”.
To date, workers are erecting walls of 3 and 4 floors of concrete blocks, and glazing is already underway at the lower levels. At the same time, specialists lay cable lines, heat supply networks and assemble a boiler room. About 60 people and 8 units of special equipment work daily on the construction site, and the delivery of the finished object is scheduled for 2027.
The development of education in the region remains a priority. In recent years, 13 modern schools for 11.2 thousand places have been built in the region. Also, under the national projects “Family” and “Youth and Children”, 107 schools, 14 kindergartens and 16 colleges are overhauled.



