In Zaostrovie installed almost 90% of the planned piles to protect the coast
In the village of Zaostrovie near Zelenogradsk continue to strengthen the coast in the area of staircase descent. This was reported in the “Balt Coast Guard”.

In the village of Zaostrovie near Zelenogradsk continue to strengthen the coast in the area of staircase descent. This was reported in the “Balt Coast Guard”.
To protect the coast, workers install wooden piles, use special bags with filler and lay large stones. So far, 315 of the 358 planned piles have been installed.
Earlier, we wrote that the DC near Guryevsk was put in order after the intervention of the prosecutor's office.



