Vasily Anokhin: We are updating the road infrastructure in the region
Vasily Anokhin noted that within the framework of the national project “Infrastructure for Life”, initiated by President Vladimir Putin, the regional center completed the repair of two streets – Popov in the Industrial District and Zoya Kosmodemyanskaya in the Leninsky District

Vasily Anokhin noted that within the framework of the national project “Infrastructure for Life”, initiated by President Vladimir Putin, the regional center completed the repair of two streets – Popov in the Industrial District and Zoya Kosmodemyanskaya in the Leninsky District.
On Popov Street, specialists restored 4.28 km of the roadway, completely replacing the asphalt concrete pavement. In addition, new sidewalks were built here, existing ones were restored, stop pavilions were replaced and a new platform with an auto pavilion was organized. Work also included laying tactile tiles, applying road markings and installing railings.
Similar transformations were completed on Zoya Kosmodemyanskaya Street, where 575 meters of the canvas was updated with a complete replacement of the coating. Here, sidewalks were also restored, tactile tiles were laid, markings were applied and fences were installed. Anokhin stressed that in addition to the quality of the coverage, special attention was paid to the safety of the participants of the movement, since a school is located near the site.
In conclusion, he added that the work on updating the road network continues. According to him, by the end of 2026 in Smolensk it is planned to repair almost 26 km of roads, and on the scale of the region to put in order more than 101 km of regional routes. The main objective of these events is to increase the safety and comfort of road traffic for all residents.



