Novosibirsk called the address of heating on October 12
In Novosibirsk continues the fourth stage of connecting housing to heating

In the left-bank part of Novosibirsk, the heat power industry concur used the resources of two CHPPs. On the line of CHPP-2 (Lenin output), batteries will start to warm up in residential buildings around Karl Marx Square, in the Telecenter area, as well as on Television and Vatutin.
From the CHPP-3, the long-awaited warmth will start to flow to the apartments of residents of the South-Western and Clean Sloboda microdistricts, on Stanislavsky, Kostychev Street, Stepnaya, Serafimovich, Rimsky-Korsakov and the temp side of Titov Street. In addition, in the Kirov district, power engineers connect to the Matryoshkin Dvor system, the North-Chemsk residential complex, as well as Dmitry Shmonin, Komsomolskaya, Herzen and Vodozabor streets.
المصرف الصحيح للمتروبوليس مقسم بين مرفقين آخرين للطاقة The CHPP-4 service zone will affect the housing stock of the Zaeltsovsky district: Timiryazev, Vavilov, Perevozchikov, Zhukovsky, Dacha, Dusi Donskoy and Northern streets.
The most impressive list of addresses is assigned to CHP-5. Heat will go to the houses on the Railway, Michurin, Pisarev, Demyan Bedny, Nekrasov, Lermontov, Siberian, Tolstoy, Leskov, Ordzhonikidze, Family Shamshin, Labor, Yadrintsevskaya, Khodilnaya, Sukharnaev, Koshurnikov, Yerhaak, وسيُدرج التدفئة أيضاً في حدود كوروليف وغوغول وغلينكا ودرزينسكي، وعلى الأراضي الواقعة خلف المعبر على طول الجادة الحمراء، وفي المنطقة السكنية في محطة نوفوسبيرسك - ماين، وفي بعض المناطق السكنية الكبيرة: شيليوسكيتسيف، وشيفشينكو، ويلتسوف، لينان، كروبوتكين، وفرونزينسكي، وزاكامينسك.
يمكنك أيضاً رصد الجدول الزمني لربط منازل نوفوسبيرسك بالتدفئة على الخريطة التفاعلية.
في وقت سابق، "MK in Novosibirsk" أفادت أن إمداد المباني السكنية بالحرارة سوف يتسارع بسبب ضربة باردة حادة.



