Novosibirsk called the address of heating on October 12
In Novosibirsk continues the fourth stage of connecting housing to heating

In the left-bank part of Novosibirsk, the heat power industry simultaneously used the resources of two CHPPs. On the line of CHPP-2 (Lenin output), batteries will begin to warm up in residential buildings around Karl Marx Square, in the Telecenter area, as well as on Television and Vatutin.
From the CHPP-3, the long-awaited warmth will begin to flow to the apartments of residents of the South-Western and Clean Sloboda microdistricts, on Stanislavsky, Kostychev Street, Stepnaya, Serafimovich, Rimsky-Korsakov and the odd side of Titov Street. In addition, in the Kirov district, power engineers connect to the Matryoshkin Dvor system, the North-Chemsk residential complex, as well as Dmitry Shmonin, Komsomolskaya, Herzen and Vodozabor streets.
The right bank of the metropolis is divided between two other energy facilities. The CHPP-4 service zone will affect the housing stock of the Zaeltsovsky district: Timiryazev, Vavilov, Perevozchikov, Zhukovsky, Dacha, Dusi Donskoy and Northern streets.
The most impressive list of addresses is assigned to CHP-5. Heat will go to the houses on the Railway, Michurin, Pisarev, Demyan Bedny, Nekrasov, Lermontov, Siberian, Tolstoy, Leskov, Ordzhonikidze, Family Shamshin, Labor, Yadrintsevskaya, Khodilnaya, Sukharna, Koshurnikov, Yermak, Derzhavin, Seleznev and street 1905. Heating will also be included in the boundaries of Korolev, Gogol, Glinka and Dzerzhinsky Avenue, on the territory behind the overpass along Red Avenue, in the residential area of the Novosibirsk-Main station and at once in several large residential areas: Chelyuskintsev, Shevchenko, Yeltsov, Linean, Kropotkin, Frunzensky and Zakamensk.
You can also monitor the schedule of connecting Novosibirsk houses to heating on the SGC interactive map.
Earlier, "MK in Novosibirsk" reported that the supply of heat to residential buildings will accelerate due to a sharp cold snap.



