In Novosibirsk for 2026 built more than 1.5 km of showers
In Novosibirsk continue to develop a storm water disposal system

According to the mayor, new storm sewerage networks and a sewer pumping station (CNS) have already appeared on Petukhov Street. The water disposal device is being completed in the Kamenka Park and near the Siberia Arena, on the streets of Ippodromskaya and Zyryanovskaya.
Now the work is being completed near future schools on the streets of Tatiana Snezhina and Bolshoi. In addition, spillwater sewer chambers are being built at the site of the main water oriental collector Yeltsovka-1.
In the near future, city services will begin laying more than 900 meters of storm sewerage on Nikolai Sotnikov Street and restoring the drainage system at 250 Titov.
“These measures are aimed at connecting new consumers to sanitation services, increasing the reliability of the system, improving the environmental and sanitary-epidemiological situation in the city, as well as reducing accidents and blockages in the storm network,” explained Maxim Kudryavtsev.
In parallel, the city hall is developing new projects for the development of storm sewerage, which are planned to be implemented in 2027. The upgrade is expected to reduce network wear, improve wastewater disposal reliability and improve wastewater treatment.
Earlier, "MK in Novosibirsk" reported that the mayor of Novosibirsk showed an updated section of Hippodromskaya after repairing the wall.



