In the SEZ "Stabna" build a building for 13 new residents
In the special economic zone of the Smolensk region, a second production building with an area of 7.1 thousand square meters is being built

In the special economic zone of the Smolensk region, a second production building with an area of 7.1 thousand square meters is being built. It can accommodate up to 13 companies. At the same time, a road and engineering infrastructure are being built.
The hull is planned to be commissioned in the third quarter of 2027. The first building of the SEZ is already fully occupied by residents working in the fields of high-tech production, instrumentation and food industry.



