Yaroslavl residents are not the first time to raise the topic of a broken race to school No. 26
As noted by residents living nearby, piles of garbage from the school was not completely removed

As noted by residents living nearby, piles of garbage from the school was not completely removed. What was left was masked with leaves. After laying the path with tiles, which, incidentally, was done just on September 1, forcing parents and children to make their way to the school in fact on the construction site, they made curbs - now they are already destroyed, and the clay earth with rain flows to the house standing next to it.
The road to the school from Shavyrin’s side was broken and did not get better, although all summer communal excavations were conducted in this place, giving some hope that order in this place would still be restored. But, alas, after the first rain, a multi-year puddle took its rightful place, forcing adults and children to puzzle about how it is safe to pass in this place.
It turns out, on the territory of the school, behind the fence, cleanliness and order, but the approaches to it still leave much to be desired, except for the central alley.
See the photo gallery on the topic



