Pool on Tukhachevsky Street in Stavropol will be completed by the end of the year
In the new swimming pool on Tukhachevsky Street in Stavropol, the main facing works and landscaping of the territory were completed

In the new swimming pool on Tukhachevsky Street in Stavropol, the main facing works and landscaping of the territory were completed. This was reported by the head of the city Ivan Ulyanchenko.
Now contractors have moved to equip the complex: engineering systems are equipped inside the premises, and the boiler room is being prepared for commissioning.
Construction is expected to be completed by the end of the year. The pool will be fully operational in 2027.



