The head of Lipetsk called the streets that will be repaired next spring
In Lipetsk completed the repair of 17 roads with a total length of more than 15 kilometers

In Lipetsk completed the repair of 17 roads with a total length of more than 15 kilometers. Contractors coped with the work ahead of schedule, and a special commission has already checked the quality of the updated coverage. In total, more than 144 thousand square meters of roads were repaired.
According to the head of Lipetsk, Mikhail Shcherbakov, the acceptance must confirm that the contractors have performed work on all requirements. The quality of the repair depends on how long the road surface will last.
The list of objects for next year has already been determined. The plans are to update more than 12 kilometers of roads on the streets of Brick, Uritsky, Budyonny, Suvorov, Parkova, Kyiv, Upper, Industrial and Krasnozavodsk. Also, the repair will affect Eletskoye highway, Zavodskaya square and the site from P. S. Kovalev street to Zavodskaya square.
Work is scheduled to begin in the spring, when weather conditions allow.



