Tuesday, October 27, 2026Moscow
Society

“Granite Age” on Belovka: instead of centuries, tiles on the Soviet lasted one winter

Orenburg residents were promised that the tiles of Mansurov granite on the main pedestrian street “should lie for centuries”

Published
“Granite Age” on Belovka: instead of centuries, tiles on the Soviet lasted one winter

Under the contract, the contractor puts in order the segment of the Soviet in the framework of warranty obligations - the guarantee is five years. The work is boiling: workers bring sand on wheelbarrows and lay tiles in the holes formed. However, the new tile is much lighter and contrastingly different from the rest of the coating - surrounded by gray granite, it looks like a white spot. Moreover, in its appearance, it resembles granite, which is now laid on the upper embankment by workers of the Novye Vek company from St. Petersburg, performing improvement there for 175.3 million rubles. Workers with wheelbarrows are in a hurry because of the fence, where work is going on on the embankment.

Separately, it is worth remembering the history of the project. The first stage of the improvement of the Soviet began in 2023: work on the site from Belovka to Pravda Street was carried out by Uni-Stroy LLC, their cost was 153,142,930.90 rubles (the initial price was higher - 171,109,420 rubles). “Now we are not laying concrete tiles, but granite. Eight. That's decades, even centuries. It will lie there for many, many years, Denis Pasler commented. The government added that the contractor “quickly adapted to the new material and the specifics of working with it.”.

Two things are important here. The first is trust in promises, the phrase of then-Governor Denis Psaler about “the century” and “the century” sounded convincing against the backdrop of the impressive amount of the contract, but the reality was different. The tile did not last a year, and now it is changed under warranty. The second is the quality of the repair, new bright patches in the center of the historical street, near the main monument, look foreign and do not solve the problem of the integrity of the coating. Moreover, in appearance, they resemble the material that is used in a nearby facility, and the question arises: is this a planned replacement or just used what was at hand? In whose hot head came the idea to repair the destroyed coating, one can only guess. But the fact remains that instead of the “granite age”, Orenburg received another stage of endless tile shifting.

And do you think that contractors who have made such defects should change the coverage at their own expense completely, rather than patching individual plots, or is warranty repair already a sufficient measure?

Source: Московский комсомолец ↗

Share

More on This Story

The son of Dmitry Gudkov committed suicide
SocietyThe son of Dmitry Gudkov committed suicide

Ivan Gudkov, the son of oppositionist Dmitry Gudkov and his first wife, Sophia Kapkova, committed suicide. Ksenia Sobchak said that he reported on the difficulties of emigration

Яна Соловьева
In the fighter MMA “Nikarho” shot from the trauma in the center of Vladikavkaz
SocietyIn the fighter MMA “Nikarho” shot from the trauma in the center of Vladikavkaz

In the center of Vladikavkaz, a man was injured as a result of shooting from a traumatic pistol, the Ministry of Internal Affairs for North Ossetia reports.

Виктория Хабарова, Александра Озерова
PCT reported 23 complaints of sick tourists from a hotel in Turkey
SocietyPCT reported 23 complaints of sick tourists from a hotel in Turkey

Since August, insurance companies have recorded 23 appeals from tourists vacationing in the Turkish hotel Bosphorus Sorgun, with similar complaints of poor health, told RBC in the press service of the Russian Union of Travel Industry (PCT).

Евгения Сорокина, Виктория Хабарова
The EIA Briefing

Keep reading, every morning.

The stories that matter, chosen by our editors and in your inbox before 7 a.m. — every weekday.

No spam. Unsubscribe anytime.