What houses of Novosibirsk connect to heating on October 15
In Novosibirsk continues the final stage of connecting apartment buildings to heating

According to the schedule of the Siberian Generating Company, the final stage covers the territories served by CHPP-2, CHPP-3, CHPP-4 and CHPP-5.
TPP-2: left bank and city center
In the Leninsky withdrawal zone, the graph includes houses in the area of Karl Marx Square, the Telecenter, on the streets of Television and Vatutin.
According to the City Conclusion, connection is provided on the streets of Communist, Soviet, Sverdlov, Uritsky, Deputy, Shchetinkin, Revolution, Lenin, Dmitry Shamshurin and Saltykov-Shchedrin.
The list also includes Komsomolsky Prospect, Dimitrov Avenue, the Railway Station and certain sections of Chaplygin and Maxim Gorky streets.
CHPP-3: South-Western and North-Chemsk housing
Heating continues to connect in the South-West residential area, the neighborhood Clean Sloboda and on the odd side of Titov street.
The schedule also includes Stanislavsky, Kostychev, Stepnaya, Serafimovich and Rimsky-Korsakov streets.
In the Kirov district, the final stage covers the North-Chemsk residential complex, the Matryoshkin yard microdistrict, Dmitry Shmonin streets, Komsomolskaya, Herzena and Water intake.
CHPP-4: northern regions of Novosibirsk
In the service area of CHPP-4, work is provided on the streets of Timiryazev, Vavilov, Perevozchikov, Zhukovsky, Dacha, Dmitry Donskoy and Northern.
TPP-5: central streets and large residential buildings
In the CHPP-5 zone, Michurin, Pisarev, Demyan Bedny, Nekrasov, Lermontov, Railway, 1905, Siberian, Tolstoy, Leskov and Ordzhonikidze streets are included in the schedule.
Connection is also provided on the streets of Sophia Shamshin, Labor, Yadrintsevskaya, Kholodilna, Sukharna, Koshurnikov, Yermak, Derzhavin and Seleznev.
The final stage included the Chelyuskintsev, Shevchenkovsky, Yeltsovsky, Linear, Kropotkinsky, Frunze and Zakamensky.
When heating will be available in all homes
In SGC specified that the supply of coolant does not mean instant heating of batteries. After the connection, specialists need to adjust the pressure and remove air from indoor systems.
Due to the cold snap, some houses were connected earlier than the original schedule. At the same time, local malfunctions remain in some areas that require repair.
If the heating in the house should already work, but the batteries remain cold, residents are advised to contact the management company or HOA. You can check the timing of connecting a specific address on the SGC interactive map.
Earlier, MK in Novosibirsk reported that power engineers published an interactive map of heating connection, which allows you to check the timing of heat supply to a particular house.



