Communal descent in Vladimir will be updated for 23.9 million rubles
In Vladimir, they plan to carry out a comprehensive improvement of the Municipal Descent - from house No. 1 on Karl Marx Street to house No. 1 on Vokzalnaya Street

In Vladimir, they plan to carry out a comprehensive improvement of the Municipal Descent - from the house No. 1 on Karl Marx Street to the house No. 1 on Vokzalnaya Street. The cost of work under the contract is 23.9 million rubles, they are expected to be completed by December 30, 2026.
On the site, the covering of the stairs and pedestrian paths will be replaced, laying new gray pavement slabs. The height of sewers and other wells will be adjusted to the level of the updated coating. To strengthen the slope on the side of Karl Marx Street, five gabion structures filled with stone will be installed.
The project also provides for drainage, lighting updates and installation of new supports and lamps. Eight lampposts will be installed to illuminate the stairs, and the existing willow willow will be illuminated with three spotlights. On the stairs there will be metal fences with built-in illumination and wooden railings under the color of larch.
Special attention will be paid to the accessibility of the route: in places of height differences and in front of obstacles, including stairs, tactile tiles will be laid for people with visual impairments. The area is greened with a roll lawn. Under the willow willow will be equipped with a platform with decorative chips, three benches and three urns will be installed.



