Nemiga, Surganova, Kalinovsky: how to solve the problem of flooding in Minsk, told in the Minsk City Executive Committee
In Minsk, there are two problematic areas of flooding - at Pinskaya and Kalvariyskaya, as well as Miroshnichenko and MKAD. The collectors will be ready by the end of the year.

In the Minsk City Executive Committee told about the complex fight against the capital flooding. According to BelTA, citing the head of the Department of Urban Economy and Energy Alexander Rakovshchik, in Minsk, 26 places of permanent flooding were identified, including Nemiga, Vaneev Square and Surganov and Kalinovsky streets.
This year, project documentation was developed for all these points and the necessary work was carried out. Prevention played an important role: in the spring and summer periods, road services in all areas of the city kept storm sewer cleaning under constant control. According to Alexander Rakovshchik, an integrated approach – from repairs to regular maintenance – has borne fruit. At the moment, there are two problem areas in the city, where work is still ongoing: in the area of Pinskaya-Kalvariyskaya streets and street. Miroshnichenko to MKAD. Director of Gordorstroy Sergey Panev assured that the construction of rain collectors at these facilities will be fully completed before the end of the year. In addition, the construction of a collector near the village of Yarkovo has already been completed.
In the future, the fight against flooding will continue: by 2030 it is planned to reconstruct about 40 objects of rain sewerage networks. The plan for 2027-2030 includes facilities in nine districts of the capital, including collectors built more than 70 years ago. Work will include the reconstruction of outdoor networks, increasing their capacity and replacing outdated brick wells.
Photo: Belt archive



