Almost the entire fleet of the road maintenance service Prikamya is ready for winter maintenance of roads
In the regional "Road and Operational Service" the preparation of equipment for winter is completed

In the regional "Road and operational service" is completing the preparation of equipment for the winter. About 200 units of equipment will be involved in the coming season - these are combined road cars, bulldozers, graders, forklifts and dump trucks. Now converted for the winter maintenance of roads already 95% of the fleet of “DES”, told in the regional Ministry of transport.
As explained by the head of DES Denis Kuryshev, the remaining 5% of the equipment is still used for the current maintenance of the road network. The staff of employees has also been strengthened – there are more road workers and driver-mechanizers. In total, 657 people will work in the winter.
Prepared for the winter snowfield of the enterprise on the Sylvensky tract. Its area exceeds 60 thousand square meters, more than 500 thousand cubic meters of snow will fit here.
A stock of deicing materials for the central planning area of Perm and regional roads has also been formed. Already harvested 100% of the required volume, that is more than 24 thousand tons of "Bionorda", galite and sand salt mixture.
DES contains a street-road network of the central planning district of Perm with a total area of 1.9 million square meters. m, as well as 140 km of regional roads.



