Pskov heat networks are preparing for cooling and replacing the pipeline on the street of Labor
Pskov Heat Networks held a weekly meeting led by Director Igor Maximov

Pskov Heat Networks held a weekly meeting under the leadership of Director Igor Maximov. The main topic was the preparation for cooling, told "MK in Pskov" in the press service of the enterprise.
Lowering the temperature increases the load on boiler and network equipment and the risk of leaks. Managers are instructed to immediately record any suspicious noises, pressure surges and traces of moisture.
Tomorrow repair work will begin on Labor Street: part of the pipeline on the roadway will be replaced there. During the work, a number of subscribers will be temporarily disconnected.
This week is the last opportunity to put the territory in order before winter. Managers will regularly travel to the sites to check the content of the facilities.



