Breeding of the bridge over Svir postponed to October 19
Uprdor "North-West" announced the transfer of the bridge across the river Svir in the Lodeinopol district from 18 to 19 October. It will be held from 13 to 15 hours. Motorists are asked to take this into account when planning routes, as traffic on the 236th kilometer of the Kola highway will be completely blocked at this time.

Uprdor "North-West" announced the transfer of the bridge across the river Svir in the Lodeinopol district from 18 to 19 October. It will be held from 13 to 15 hours. Motorists are asked to take this into account when planning routes, as traffic on the 236th kilometer of the Kola highway will be completely blocked at this time.
The reason for wiring is the skip of the composition of ships with a maximum height of 20 meters: Raidovy-5, Grosta and auxiliary tug. If the vessels are delayed and do not have time to approach the bridge, the wiring will be postponed to October 20, the department said. Drawing time is also from 13 to 15 hours.



