In Berdyansk repair 800 meters of sewer
The worn-out section of the pipe will be restored without destroying the road

Specialists of Berdyansk PUVKH are cleaning the section of the sewer on Melitopol highway. This was reported by the press service of the SUE ZO “Water of Zaporizhia”.
Workers mechanically clean the pipes before restoration by sanitization. The “pipe in the pipe” technology allows you to replace the worn-out section without destroying the road.
The total length of the collector is 800 meters. Now the open method has already replaced 420 meters. Further work will continue with the use of rehabilitation.



