Wednesday, October 14, 2026Moscow
Society

In Kaluga blocked part of the street Stepan Razin

In Kaluga began updating the sewer network on Stepan Razin street.

Published
In Kaluga blocked part of the street Stepan Razin

In Kaluga began updating the sewer network on Stepan Razin street.

Specialists of Kalugaoblvodokanal will replace 300 meters of gravity collector with a diameter of 300 millimeters. Work is carried out under the investment program.

Until October 26, traffic is limited on the odd side of the street - on the segment from the 1st Hospital Lane to Nikitin Street. This stage of the program is planned to be completed by the end of 2026.

The progress of work was reported by the Minister of Construction and Housing of the Kaluga region Vyacheslav Lezhnin.

Kaluga restaurateurs and hoteliers will meet to solve the main problems of the industry.

Source: Московский комсомолец ↗

Share

More on This Story

Wife banned from watching journalists: Czech coach became a star
SocietyWife banned from watching journalists: Czech coach became a star

Head coach of the Czech football club “Usti nad Labem” David Oulegla became a hero of discussions in social networks after a post-match interview with a beautiful journalist Sabina Yashkova, distinguished by a lush bust

МК
From October for owners of cottages begin to operate 6 new rules
SocietyFrom October for owners of cottages begin to operate 6 new rules

6 new rules for summer residents from october 2026: what is now fined and how not to lose the plot.

МК
Over Corsica captured rare “red sprites”. Photo Photo
SocietyOver Corsica captured rare “red sprites”. Photo Photo

Over Corsica captured a rare natural phenomenon – “red sprites”.

Кирилл Бевзюк
The EIA Briefing

Keep reading, every morning.

The stories that matter, chosen by our editors and in your inbox before 7 a.m. — every weekday.

No spam. Unsubscribe anytime.