In Minsk, an increased noise level is possible due to planned work at the CHPP-4
On the Minsk CHPP-4 from 9 to 11 September carry out start-up operations on the main equipment. In connection with this ...

On the Minsk CHPP-4 from 9 to 11 September carry out start-up operations on the main equipment. In this regard, an increased level of noise is possible, the correspondent of the Minsk-Novosti agency reports with reference to the Telegram channel Minskenergo.
As explained at the enterprise, the work is a planned and mandatory stage of preparation for the upcoming heating season. Launch operations are necessary in order to make sure that the equipment is ready for high loads and to confirm the ability of the station to uninterruptedly supply consumers with heat and electricity during the autumn-winter period. Specialists check the main equipment and debug all control systems, which allows you to detect and eliminate possible deviations in advance.
To minimize the impact on the comfort of residents, the main work is planned mainly during the day. In "Minskenergo" apologize to citizens for the inconvenience.



