In Ryazan massively turned off the heating
On Saturday, October 17, in Ryazan due to repair and restoration work on the main pipeline there was a mass shutdown of heating

On Saturday, October 17, in Ryazan, due to repair and restoration work on the main pipeline, a massive heating blackout occurred. This was reported to MUP RMPTS.
It is specified that during the repair work, the supply of coolant to the following addresses was suspended:
There is also no heating in kindergartens No. 69, 77, 78 and schools No. 11, 41.
The work is scheduled to be completed by 15:00.



